Air Conditioning, Heating & Air Duct system Replacement

Air Conditioning,
Heating & Air Duct
system Replacement

Client concerns and goals that we had to meet Existing Air conditioner 30 years old, highly inefficient, unreliable operation, and very noisy both outside and inside. Goal was to reduce HVAC system noise, increase efficiency, increase performance, and do it with a reliable brand. Additional goal was to address the lack of overall airflow upstairs, the guest bedroom in particular.
Project Challenges
The equipment platform in the garage did not have enough height to ensure proper access to the new HVAC system. The air return pop-out on the left of the platform was not big enough to allow adequate return airflow to the system. The platform had to be re-engineered to allow for sufficient return airflow and gain the extra height needed to install the new system. Operation sound was reduced by selecting a Lennox Signature Line soft-starting furnace, lining the new return air space with sound-absorbing insulation and installing a variable capacity (soft starting) air conditioning unit.
Project Result
Energy efficient (20 SEER) new variable capacity system with greatly reduced operation sound. Greatly improved temperature/humidity control and overall performance. Beautifully re-engineered equipment platform to improve durability and airflow efficiency. Air flow issues were resolved by re-designing (and upsizing) the air duct system. The client is very happy with the outcome. Click HERE to read the client review of the installation

information

  • Category  Complete HVAC Replacement
  • Date  10/01/2021
  • Location  Chino Hills, Orange County
  • Tags  Heating, Cooling, Air Ducts, Equipment
               Platform Rebuild